NOE®tec Tunnel Wagenladungsstrasse Stuttgart

Tunnel Wagenladungsstrasse Stuttgart, Germany

This tunnel connects the Europaviertel district and the Milaneo shopping centre at Stuttgart's main railway station. Two adjustable-height NOEtec deck formwork carriages were used in the construction of the tunnel: a double adjustable-height formwork carriage was used in the "Londoner Strasse" section and a triple in the area of the „Anlieferungsast Milaneo“ delivery spur.

The technique of using just one deck formwork carriage for concreting multiple decks can be implemented only with NOEtec deck formwork carriages.